BIA Terminal 2 Expansion 29/07/2008

BIA Terminal 2 Expansion


Value: £7m (2006)

Area:

Contract: JCT Design & Build

Role: Lead Designer, Architect RIBA Work Stage A > L (retained client consultant)

Client: Birmingham International Airport

Sector: Transportation

D5 were tasked with expanding check-in and baggage handling capacity for Terminal 2 to expand the throughput of the terminal with multiple airline users.

The scheme reconfigured the landside concourse to relocate vertical circulation, rationalise retail and ticket desks and create an extended check-in bank adding an additional 14 desks. Works to the landside check-in concourse were matched with the construction of a new airside baggage make-up hall linked to the existing hall doubling baggage handling capacity. Furthermore, two new lift and stair cores were built either side of the baggage hall to facilitate passenger bussing to and from aircraft.  

As with many such projects, the works were completed within the live operational environment of the airport requiring intense client and contractor coordination and liaison.